Tri-Mach was awarded the mechanical installation of a state-of-the-art processing line for a sausage manufacturing facility in Saskatoon, SK.
The project began in May 2012 and was completed in mid-August 2012. During this time, Tri-Mach successfully installed a continuous formulation, cooking, cooling, and packaging system. This work included the installation of all piping, air, steam, plumbing, electrical and various food processing equipment.
A major accomplishment for Tri-Mach on this project was the installation of one of the heaviest pieces of processing equipment we’ve ever worked with, weighing over 100,000lbs. Tri-Mach safely unloaded, assembled, and squeezed the unit into the building ahead of schedule.
Another successful project completed by our team at Tri-Mach.